This project replaced an existing bridge carrying SR-3051 over SR-0022 (4-lane, limited access). Responsibilities included all roadway design aspects for the project, including the preparation of final construction plans and cross sections, design of guide-rail approaches, replacement of existing drainage facilities and tabulation of all quantities.