This project involved a replacement bridge of a 210’ single span composite steel multi-girder replacement bridge over Walnut Creek, including 150-feet of approach roadway. The Mackin survey staff contributed to the project by performing surveying services for determining topography, alignment, bench levels, and cross-sections; property line evidence; and hydraulic survey.