This project included the design of 3 ½ miles of urban expressway, including 1 ½ interchanges, side roads and connector roads, and 7 moderate and major structures including a dual 3 span bridge, as well as 2 dual single span bridges, and 1 arch culvert. Services included field survey, traffic, roadway and structure design, stormwater management, right of way plan preparation, erosion & sedimentation control, coordination of a 5-firm design team, and construction consultation.